Operation days calendar

Departure times and station stops differ
by operating dates.
Tap on your preferred date on the calendar to display
the stations where stops will be and departure times.

From May 28 ~ July 1 random operation of the two train series!

Click the date you want to ride to check on operating status!

2025.04

2025.05

2025.06

  • *Please note that unannounced and sudden changes may occur in the status of this service plan due to route conditions or other contributing factors.
  • *Confirm the latest operation status here.
  • *There may be cases when the “ONE PIECE Shinkansen” is operated on dates other than those indicated on the calendar.
  • *From May 28, one of the first two “ONE PIECE Shinkansen” series will be operated.
  • *Train service dates from July 1 will be announced when they are decided.

Timetable Use these icons to confirm stations where trains stop and departure times!

Tap the icon to display stations where stops are made and departure times.

下り

  • こだま849号(新大阪→博多)

上り

  • こだま842号(博多→新大阪)

  • 下り

    こだま849号(新大阪→博多)

  • 上り

    こだま842号(博多→新大阪)